<html>
Thank you for your question, Andres.<br><br>
Ben Wright at
<a href="http://www.rasch.org/rmt/rmt101f.htm" eudora="autourl">www.rasch.org/rmt/rmt101f.htm</a>
recommends using pre- and post- test data together to estimate the rating scale structure anchors. You can then anchor the rating scale structures, and use the post-test data to estimate the item anchors.<br><br>
Rasch measures are remarkably robust against disordered thresholds (low frequency categories) so don't collapse categories if they are merely sampling effects (not due to structural flaws in the rating scale). <br><br>
Cordially,<br>
Mike L.<br><br>
At 5/31/2008, you wrote:<br>
<blockquote type=cite class=cite cite>Which could be the best way to put pre test results on the post test frame of reference?</blockquote>
<x-sigsep><p></x-sigsep>
Mike Linacre<br>
Editor, Rasch Measurement Transactions<br>
rmt@rasch.org <a href="http://www.rasch.org/rmt/" eudora="autourl"><font color="#0000FF"><u>www.rasch.org/rmt/</a></u></font> Latest RMT:&nbsp; 21:4 Spring 2008</html>